FOLLOW US

  • White Instagram Icon
  • White LinkedIn Icon
  • White YouTube Icon

Projects

We were able to return this tank to service within 7 days of receiving it empty and dry. 

Our system SAVED the client downtime, water re-routing costs, and tank replacement.

Internal Piping
Internal Pipe Prior To Coating
Tank Floor
Tank Floor Before Blasting
Tank Walls and Floor
Tank after Cleanout
Tank Walls And Floor
Inside Tank After Coating
Tank Piping
Tank Piping After Coating
Tank Floor
Tank Floor After Coating
Show More

We were able to have two sets of these well pipes coated in two days for our client 

Our system is saving our client time and money by eliminating the need for constant re-painting.  We also eliminated external corrosion issues that were due to the Gulf Coast humidity and salty air conditions.

Well Pipe Before Coating
Well Pipe Pre-Blasting
Well Pipe Corrosion
Well Pipe After Coating
Valves After Coating
Well Pipe After Coating
Show More

We were able to return this tank to service within 4 days of receiving it empty and dry. 

Our system SAVED the client downtime, water re-routing costs, and over $100k vs replacement.

Exterior Before Coating
Exterior After Coating
Tank Floor w/ Holes
Floor After Coating
Ceiling Before Coating
Ceiling After Coating
Show More

This project helped our client avoid replacing their entire waste water treatment plant.

We SAVED our client a month of down-time and over $200k

Clarifier Before Coating
Clarifier After Coating
Clarifier Side by Side
Chlorinator Before
Chlorinator After
Calrifier Walls After Coating
Show More

This tank was set to be replaced and the board of directors for the city opted to rehabilitate using our Tank Fortress System.

We SAVED the client 3 weeks of downtime and $150k.

Interior Wall Before Coating
Interior Wall After Coating
Tank Floor Before
Tank Floor After
Tank Wall Up Close
Tank Wall After Coating
Show More

This tank had large holes and the operator was seeking a grant to replace the tank. 

We were able to rehabilitate the tank and save the city money and time in the grant process.

Exterior Before Coating
Exterior After Coating
Holes in Ceiling
Ceiling After Coating
Interior Wall Before
Interior Wall After
Show More

This small municipality needed their tank rehabilitated but could not afford to have the tank down more than 4 days.

We were able to complete the work and have the tank on-line in 3 days and under budget.

Exterior Before Coating
Exterior After Coating
Interior Walls Before
Interior Walls After
Holes In Interior Walls
Holes Gone After Coating
Show More

This was a last minute quick turnaround pipe project for one of our clients. 

This project was done with epoxy; however, it can also be done with polyurea/polyurethane

Fire Hydrant Piping
Fire Hydrant Piping
Fire Hydrant Piping
Fire Hydrant Piping
Fire Hydrant Piping
Fire Hydrant Piping
Show More

This project was carried out in Louisiana as an alternative to cementitious repair.

We used our poly system and completed the work ahead of schedule and on budget.

Before Prep
After Coating
Post Application
Newly Lined
Protective Coating
Manhole Lining Polyurea
Show More

Our GC Customs divisions carried out this custom work for a recent car show in Houston, TX.

GC Customs specializes in High End Off Road and Extreme 4x4 Coatings.

Jeep Before Coating
Jeep After Coating
Jeep Before Coating
Jeep After Coating
Jeep Top After Coating
Texture Of The Coating
Show More

Global Coat is about solutions for our clients.

We will take on projects that meet all of our clients needs no matter how specialized.

1 of 3 52' Skids
ISO Tank Lining
ISO Tank Lining
Offshore Tool Box Coating
Offshore Toolbox Lining
Offshore Crane Cab
Show More